Beyside Portgordons Ltd Generation Station
接入登记 · scoping
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| MW Connected | 0 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-d7373c5ede783d07b9689c86 |
| MW Increase / Decrease | 1.07 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-d7373c5ede783d07b9689c86 |
| Cumulative Total Capacity (MW) | 1.07 MW | 原始来源列定义 · project stage · Scoping 基准日期 2026-10-01 依据 EV-d7373c5ede783d07b9689c86 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Project Name | Beyside Portgordons Ltd Generation Station |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Keith 1 132/33kV GSP Substation |
| Stage | 未获取 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 1.07 |
| Cumulative Total Capacity (MW) | 1.07 |
| MW Effective From | 2024-03-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | CCGT (Combined Cycle Gas Turbine) |
| Project ID | a0l4L0000005iQTQAY |
| Project Number | PRO-001886 |
| Gate | 未获取 |
| 原文状态 | Scoping |
| source_record_id | csv:row:64 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-10-01 · 收集核实 2026-10-05
Supported by National Energy SO Open Data
原文位置 csv:row:64
依据 EV-d7373c5ede783d07b9689c86资料SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 9795f741c6dd4125f62683c1af798d104b4071d1ecf3accceeafa584918c34f6
