Aurora Renewable Energy (Hybrid) / AURRB
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 50 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-e0d790c6132ef90ad69edcc3 |
| Net Summer Capacity (MW) | 50 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-e0d790c6132ef90ad69edcc3 |
| Net Winter Capacity (MW) | 50 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-e0d790c6132ef90ad69edcc3 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 67983 |
| Plant Name | Aurora Renewable Energy (Hybrid) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Stanislaus |
| Balancing Authority Code | BANC |
| Sector | IPP Non-CHP |
| Generator ID | AURRB |
| Nameplate Capacity (MW) | 50 |
| Net Summer Capacity (MW) | 50 |
| Net Winter Capacity (MW) | 50 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 4 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.628805 |
| Longitude | -121.0714 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1500 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:986
依据 EV-67c2f0f6ec39e73cddb1e145资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 47852dad0c0cabf02014c8e31498960bd96e7f60903c75688138ef34c466b15c
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1500
依据 EV-e0d790c6132ef90ad69edcc3资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ebe4b25530cd515143e844de8dd60001e016c271334cee3297ef580de792670e