Aurora Renewable Energy (Hybrid) / AURRB
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 50 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-e0d790c6132ef90ad69edcc3 |
| Net Summer Capacity (MW) | 50 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-e0d790c6132ef90ad69edcc3 |
| Net Winter Capacity (MW) | 50 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-e0d790c6132ef90ad69edcc3 |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 67983 |
| Plant Name | Aurora Renewable Energy (Hybrid) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Stanislaus |
| Balancing Authority Code | BANC |
| Sector | IPP Non-CHP |
| Generator ID | AURRB |
| Nameplate Capacity (MW) | 50 |
| Net Summer Capacity (MW) | 50 |
| Net Winter Capacity (MW) | 50 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 4 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.628805 |
| Longitude | -121.0714 |
| 원문 상태 | (P) Planned for installation, but regulatory approvals not initiated |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1500 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:986
근거 EV-67c2f0f6ec39e73cddb1e145자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 47852dad0c0cabf02014c8e31498960bd96e7f60903c75688138ef34c466b15c
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:1500
근거 EV-e0d790c6132ef90ad69edcc3자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ebe4b25530cd515143e844de8dd60001e016c271334cee3297ef580de792670e
