Sardis Lake Hydroelectric Project / NA2
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 7.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-05c6f866110e25c06406202d |
| Net Summer Capacity (MW) | 5.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-05c6f866110e25c06406202d |
| Net Winter Capacity (MW) | 4.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-05c6f866110e25c06406202d |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 61906 |
| Entity Name | Rye Development |
| Plant ID | 62425 |
| Plant Name | Sardis Lake Hydroelectric Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MS |
| County | Panola |
| Balancing Authority Code | TVA |
| Sector | IPP Non-CHP |
| Generator ID | NA2 |
| Nameplate Capacity (MW) | 7.5 |
| Net Summer Capacity (MW) | 5.5 |
| Net Winter Capacity (MW) | 4.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 11 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 34.399125 |
| Longitude | -89.77246 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1716 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:324
依据 EV-0ac63843139583f7c28ae7d2资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1b85ad7682b4c2183bc8d92baac804d96e84f2d7a3c7f4149c6a73b69f9118ed
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1716
依据 EV-05c6f866110e25c06406202d资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b2ed33a0f77d246be836c3dfd0b4ce15b9c20c107067efab225ea1b56680e2ab