这是保留各来源观测的部分收集资料。发电及接入登记容量与数据中心供电余量不同。计划日期和合同公告不代表实际送电或供电开始。
当前条件 3条 · 当前页 1–3 · 为来源记录数,并非独立设施数。
电力对象与项目 · USA · eia860mSardis Lake Hydroelectric Project / NA2
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|
| Nameplate Capacity (MW) | 7.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-05c6f866110e25c06406202d |
| Net Summer Capacity (MW) | 5.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-05c6f866110e25c06406202d |
| Net Winter Capacity (MW) | 4.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-05c6f866110e25c06406202d |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 61906 |
| Entity Name | Rye Development |
| Plant ID | 62425 |
| Plant Name | Sardis Lake Hydroelectric Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MS |
| County | Panola |
| Balancing Authority Code | TVA |
| Sector | IPP Non-CHP |
| Generator ID | NA2 |
| Nameplate Capacity (MW) | 7.5 |
| Net Summer Capacity (MW) | 5.5 |
| Net Winter Capacity (MW) | 4.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 11 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 34.399125 |
| Longitude | -89.77246 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1716 |
上级设施或电厂记录
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:324
依据 EV-0ac63843139583f7c28ae7d2
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1b85ad7682b4c2183bc8d92baac804d96e84f2d7a3c7f4149c6a73b69f9118ed使用条件 US government public domain
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1716
依据 EV-05c6f866110e25c06406202d
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b2ed33a0f77d246be836c3dfd0b4ce15b9c20c107067efab225ea1b56680e2ab使用条件 US government public domain
来源各时点记录 · USA · eia860Sardis Lake Hydroelectric Project / NA2
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Utility ID | 61906 |
| Utility Name | Rye Development |
| Plant Code | 62425 |
| Plant Name | Sardis Lake Hydroelectric Project |
| State | MS |
| County | Panola |
| Generator ID | NA2 |
| Technology | Conventional Hydroelectric |
| Prime Mover | HY |
| Ownership | S |
| Duct Burners | X |
| Can Bypass Heat Recovery Steam Generator? | X |
| Nameplate Capacity (MW) | 7.5 |
| Nameplate Power Factor | 0.9 |
| Summer Capacity (MW) | 5.5 |
| Winter Capacity (MW) | 4.5 |
| Status | P |
| Effective Month | 11 |
| Effective Year | 2022 |
| Current Month | 11 |
| Current Year | 2028 |
| Associated with Combined Heat and Power System | N |
| Sector Name | IPP Non-CHP |
| Sector | 2 |
| Previously Canceled | N |
| Energy Source 1 | WAT |
| 原文状态 | P |
| source_record_id | 3_1_Generator_Y2025.xlsx#Proposed:324 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860 ↗数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:324
依据 EV-0ac63843139583f7c28ae7d2
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1b85ad7682b4c2183bc8d92baac804d96e84f2d7a3c7f4149c6a73b69f9118ed使用条件 US government public domain
来源各时点记录 · USA · eia860mSardis Lake Hydroelectric Project / NA2
发电机 · 计划
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|
| Entity ID | 61906 |
| Entity Name | Rye Development |
| Plant ID | 62425 |
| Plant Name | Sardis Lake Hydroelectric Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MS |
| County | Panola |
| Balancing Authority Code | TVA |
| Sector | IPP Non-CHP |
| Generator ID | NA2 |
| Nameplate Capacity (MW) | 7.5 |
| Net Summer Capacity (MW) | 5.5 |
| Net Winter Capacity (MW) | 4.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 11 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 34.399125 |
| Longitude | -89.77246 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| source_record_id | Planned:1716 |
上级设施或电厂记录
没有单独的指标汇总,请查看原始来源详细字段。
原文、基准日期与核实日期 1条
eia860m ↗数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1716
依据 EV-05c6f866110e25c06406202d
资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c