Thompson Falls / TF6
发电机 · 停运
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 7 MW | 原始来源列定义 · 发电机 · (OS) Out of service and NOT expected to return to service in next calendar year 基准日期 2026-08 依据 EV-9afa2bf503c4ba4bb2a44a68 |
| Net Summer Capacity (MW) | 6.5 MW | 原始来源列定义 · 发电机 · (OS) Out of service and NOT expected to return to service in next calendar year 基准日期 2026-08 依据 EV-9afa2bf503c4ba4bb2a44a68 |
| Net Winter Capacity (MW) | 6.5 MW | 原始来源列定义 · 发电机 · (OS) Out of service and NOT expected to return to service in next calendar year 基准日期 2026-08 依据 EV-9afa2bf503c4ba4bb2a44a68 |
| Planned Uprate of Summer Capacity (MW) | 1.5 MW | 原始来源列定义 · 发电机 · (OS) Out of service and NOT expected to return to service in next calendar year 基准日期 2026-08 依据 EV-9afa2bf503c4ba4bb2a44a68 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 13902 |
| Entity Name | NorthWestern Energy (MT Hydro) |
| Plant ID | 2195 |
| Plant Name | Thompson Falls |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MT |
| County | Sanders |
| Balancing Authority Code | NWMT |
| Sector | Electric Utility |
| Generator ID | TF6 |
| Nameplate Capacity (MW) | 7 |
| Net Summer Capacity (MW) | 6.5 |
| Net Winter Capacity (MW) | 6.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 7 |
| Operating Year | 1915 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Planned Uprate Year | 2027 |
| Planned Uprate Month | 2 |
| Planned Uprate of Summer Capacity (MW) | 1.5 |
| Latitude | 47.593155 |
| Longitude | -115.3582 |
| 原文状态 | (OS) Out of service and NOT expected to return to service in next calendar year |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:3355 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:3349
依据 EV-619380ce37329be0562e8c8c资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 39850c4dd7d20dedfaa47fa639afe335f086939b0731021032337fdcba9445fe
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:3355
依据 EV-9afa2bf503c4ba4bb2a44a68资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a29df974b7971f9386a3fc181f318fcb8982f5d7158d117eec984e8d379ac96e
