Adelaide Desalination Plant
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 2.75 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-7feef1fb9840064ef3bd9e5b |
| Aggregated Nameplate Capacity (MW AC) | 13.75 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-7feef1fb9840064ef3bd9e5b |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 1844 |
| Site Name | Adelaide Desalination Plant |
| Site Owner | South Australian Water Corporation |
| Region | SA1 |
| Max Site Capacity (AC) | 26 |
| Gen Info Unit ID | 184407 |
| Unit Name | ADPPV2 |
| Technology Type | Solar PV |
| Technology Detail | Fixed |
| DUID | ADPPV2 |
| Dispatch Type | Semi-scheduled |
| Unit Count | 5 |
| Unit Capacity (MW AC) | 2.75 |
| Aggregated Nameplate Capacity (MW AC) | 13.75 |
| Commitment Status | In Service |
| Expected Closure Year | 2041 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-18T15:29:04 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | In Service |
| source_record_id | Generator Information:9 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 2条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:9
依据 EV-7feef1fb9840064ef3bd9e5b资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 c620ea851da1dcb958b56424cfd4f85636ea9c77910ff1d6f2662a7011c2e96f
使用条件 AEMO general copyright permission subject to exceptions
数据来源 2026-07-24 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Expected Closure Year:5
依据 EV-dcabd29c3c5154b6801289bc资料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 4ce0908e7265f23f08db38f04d76d14bdb5757f2179632e39ceefc44420f321d
使用条件 AEMO general copyright permission subject to exceptions
