Pavo
Instalaciones de generación · Sin confirmar
| Indicador o condición | Valor de la fuente | Base, alcance y fase |
|---|---|---|
| Grid Voltage (kV) | 138 kV | Definición de la columna de origen · Central eléctrica · Sin confirmar Fecha de referencia 2025 Fundamento EV-942ae3b9e46a032283cd1b5c |
Campos detallados de la fuente
| Campo de origen | Valor o condición publicados |
|---|---|
| Utility ID | 56201 |
| Utility Name | Engie North America |
| Plant Code | 65492 |
| Plant Name | Pavo |
| Street Address | 5898 E I-10 |
| City | Fort Stockton |
| State | TX |
| Zip | 79735 |
| County | Pecos |
| Latitude | 30.885123 |
| Longitude | -102.42261 |
| NERC Region | TRE |
| Balancing Authority Code | ERCO |
| Balancing Authority Name | Electric Reliability Council of Texas, Inc. |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Texas-New Mexico Power Co |
| Transmission or Distribution System Owner ID | 40051 |
| Transmission or Distribution System Owner State | TX |
| Grid Voltage (kV) | 138 |
| Energy Storage | Y |
| Precisión de coordenadas | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:12629 |
Coordinates locate the plant, including when this record describes one generator.
Ubicación: Ubicación de la central · no del generador individual
Fuentes y fechas de referencia y consulta 1registros
Fuente de los datos 2025 · Consultado 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Ubicación en la fuente 2___Plant_Y2025.xlsx#Plant:12629
Fundamento EV-942ae3b9e46a032283cd1b5cSHA-256 de la evidencia 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0cb1fcf08d61792b0be0fb9f6654201ebc53e44313e19d12bcea4d8ae5b5d825
Condiciones de uso US government public domain
