Cumberland (TN) / CTG1
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 454.8 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-c77b094d75d4b8cdeab7808b |
| Net Summer Capacity (MW) | 372.9 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-c77b094d75d4b8cdeab7808b |
| Net Winter Capacity (MW) | 409.3 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-c77b094d75d4b8cdeab7808b |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 18642 |
| Entity Name | Tennessee Valley Authority |
| Plant ID | 3399 |
| Plant Name | Cumberland (TN) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TN |
| County | Stewart |
| Balancing Authority Code | TVA |
| Sector | Electric Utility |
| Generator ID | CTG1 |
| Unit Code | 1 |
| Nameplate Capacity (MW) | 454.8 |
| Net Summer Capacity (MW) | 372.9 |
| Net Winter Capacity (MW) | 409.3 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2034 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 36.3903 |
| Longitude | -87.6539 |
| 원문 상태 | (U) Under construction, less than or equal to 50 percent complete |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2311 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:71
근거 EV-a9f4765271619b6ce1888aec자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 99152143c64cb2ad99e148fa88daffb743ea90fe1b44792f99dd80dd5c7a2edd
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.