0 Middle
发电设施 · 未确认
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Grid Voltage (kV) | 22.8 kV | 原始来源列定义 · 发电厂 · 未确认 基准日期 2025 依据 EV-5128ee6f425239cdcb7691f4 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Utility ID | 65043 |
| Utility Name | Madison Energy Investments LLC |
| Plant Code | 69544 |
| Plant Name | 0 Middle |
| Street Address | 0 Middle Rd |
| City | Chatham |
| State | MA |
| Zip | 2659 |
| County | Barnstable |
| Latitude | 41.690131 |
| Longitude | -70.008775 |
| NERC Region | NPCC |
| Balancing Authority Code | ISNE |
| Balancing Authority Name | ISO New England Inc. |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | Y |
| FERC Small Power Producer Docket Number | 21-1212-001 |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | NSTAR Electric Company |
| Transmission or Distribution System Owner ID | 54913 |
| Transmission or Distribution System Owner State | MA |
| Grid Voltage (kV) | 22.8 |
| Energy Storage | Y |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:16456 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 1条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 2___Plant_Y2025.xlsx#Plant:16456
依据 EV-5128ee6f425239cdcb7691f4资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 22712aecb19010cbbe6ed5d806814e676e9bb76aa7efa72e8f4052867b304da7
