Allt Cheanna Mhuir Hydro Generating Station
接入登记 · built
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| MW Connected | 1.75 MW | 原始来源列定义 · project stage · Built 基准日期 2026-10-01 依据 EV-eced005b562013e8fcbd170e |
| MW Increase / Decrease | 0 MW | 原始来源列定义 · project stage · Built 基准日期 2026-10-01 依据 EV-eced005b562013e8fcbd170e |
| Cumulative Total Capacity (MW) | 1.75 MW | 原始来源列定义 · project stage · Built 基准日期 2026-10-01 依据 EV-eced005b562013e8fcbd170e |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Project Name | Allt Cheanna Mhuir Hydro Generating Station |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Fort William GSP |
| Stage | 未获取 |
| MW Connected | 1.75 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 1.75 |
| MW Effective From | 未获取 |
| Project Status | Built |
| HOST TO | SHET |
| Plant Type | Hydro |
| Project ID | a0l4L0000005iqaQAA |
| Project Number | PRO-000614 |
| Gate | 未获取 |
| 原文状态 | Built |
| source_record_id | csv:row:13 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-10-01 · 收集核实 2026-10-05
Supported by National Energy SO Open Data
原文位置 csv:row:13
依据 EV-eced005b562013e8fcbd170e资料SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 43350d98d5036eb71e4ac68b2cedf7b7d8604423d2e68459c281be6a96b3f5d6
