Clachaig Glen Wind Farm
接入登记 · consented
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| MW Connected | 0 MW | 原始来源列定义 · project stage · Consents Approved 基准日期 2026-10-01 依据 EV-18d3c6149193b76fc2870ccc |
| MW Increase / Decrease | 5.2 MW | 原始来源列定义 · project stage · Consents Approved 基准日期 2026-10-01 依据 EV-18d3c6149193b76fc2870ccc |
| Cumulative Total Capacity (MW) | 52.8 MW | 原始来源列定义 · project stage · Consents Approved 基准日期 2026-10-01 依据 EV-18d3c6149193b76fc2870ccc |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Project Name | Clachaig Glen Wind Farm |
| Customer Name | RWE Renewables UK Onshore Wind Limited |
| Connection Site | Carradale 2 132/33kV GSP Substation |
| Stage | 2.00 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 5.20 |
| Cumulative Total Capacity (MW) | 52.80 |
| MW Effective From | 2034-10-31 |
| Project Status | Consents Approved |
| HOST TO | SHET |
| Plant Type | Energy Storage System;Wind Onshore |
| Project ID | a0l4L0000005iPqQAI |
| Project Number | PRO-000878-2 |
| Gate | 未获取 |
| 原文状态 | Consents Approved |
| source_record_id | csv:row:136 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-10-01 · 收集核实 2026-10-05
Supported by National Energy SO Open Data
原文位置 csv:row:136
依据 EV-18d3c6149193b76fc2870ccc资料SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 0120e38b81aed7c9dc02190e3ea13c298d01d3a0f41d29030b81e745a8c20d55
