154kV 남천안-천안 전력구 건설사업
电力项目 · 建设项目
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| project_name_voltage_label | 154 kV | literal project name label not service voltage · project name · 建设项目 基准日期 2026-09 依据 EV-caa373b067893eb1bd31a171 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| stable_project_id | kproj_bc02fca210627a12 |
| stable_project_key | prjtDef:234730:ESB |
| project_definition | 234730 |
| first_region_code | ESB |
| manual_source_format | false |
| project_name | 154kV 남천안-천안 전력구 건설사업 |
| project_name_list | 천안지역 전기공급시설 전력구공사(남천안-천안) |
| purpose | 천안지역 전력공급능력 확보 |
| project_region_detail | 충청남도 천안시 동남구 |
| project_period_raw | 2024.04~2029.10 |
| project_scale_raw | 154KV XLPE 2500(D)X2C, L=3.0KM |
| responsible_office_raw | 중부건설본부/직할 |
| equipment_type | 전력구 |
| headquarters | 중부건설본부 |
| office | 직할 |
| current_stage_raw | 사업승인-공사착수전 |
| snapshot_count | 1 |
| active_snapshot_count | 1 |
| snapshot_ids |
|
| first_seen_at | 2026-10-02 |
| last_confirmed_at | 2026-10-02T01:55:13Z |
| location_precision | region_only |
| geometry_semantics | no_verified_geometry |
| geometry | 未获取 |
| source_list_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do |
| source_detail_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do |
| 原文状态 | 사업승인-공사착수전 |
| source_record_id | stable_project_id:kproj_bc02fca210627a12 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-09 · 收集核实 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
原文位置 stable_project_id:kproj_bc02fca210627a12
依据 EV-caa373b067893eb1bd31a171资料SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 057a326f2a948032575e7948435d1f815126b0e3c7e0a02fb804cd8600a0ce3a
