154kV 고림S/S 건설사업
电力项目 · 建设项目
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| project_name_voltage_label | 154 kV | literal project name label not service voltage · project name · 建设项目 基准日期 2026-09 依据 EV-75b6b6c37795fd1d40bbae75 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| stable_project_id | kproj_ba58f264ee960952 |
| stable_project_key | prjtDef:231529:ESB |
| project_definition | 231529 |
| first_region_code | ESB |
| manual_source_format | false |
| project_name | 154kV 고림S/S 건설사업 |
| project_name_list | 154kV 고림변전소 건설사업 |
| purpose | 용인국제물류4.0 물류단지 신규부하 공급 |
| project_region_detail | 경기도 용인시 처인구 |
| project_period_raw | 2021.07~2027.03 |
| project_scale_raw | 154/23KV 45/60MVA X 2BANK |
| responsible_office_raw | 경인건설본부/경기건설지사 |
| equipment_type | 변전 |
| headquarters | 경인건설본부 |
| office | 경기건설지사 |
| current_stage_raw | 공사착수-사업완료전 |
| snapshot_count | 1 |
| active_snapshot_count | 1 |
| snapshot_ids |
|
| first_seen_at | 2026-10-02 |
| last_confirmed_at | 2026-10-02T01:55:13Z |
| location_precision | region_only |
| geometry_semantics | no_verified_geometry |
| geometry | 未获取 |
| source_list_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do |
| source_detail_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do |
| 原文状态 | 공사착수-사업완료전 |
| source_record_id | stable_project_id:kproj_ba58f264ee960952 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 1条
数据来源 2026-09 · 收集核实 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
原文位置 stable_project_id:kproj_ba58f264ee960952
依据 EV-75b6b6c37795fd1d40bbae75资料SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3167c383f5647547c43620d9d67487201e48e1eea1160c37077ec5872a2649d4