Allen CSG
发电设施 · 未确认
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Grid Voltage (kV) | 12.47 kV | 原始来源列定义 · 发电厂 · 未确认 基准日期 2025 依据 EV-417dd9bc26af033bdfe9c0a8 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Utility ID | 64904 |
| Utility Name | AES Clean Energy |
| Plant Code | 70177 |
| Plant Name | Allen CSG |
| Street Address | 4117 E Sycamore St |
| City | Chillicothe |
| State | IL |
| Zip | 61523 |
| County | Peoria |
| Latitude | 40.9166 |
| Longitude | -89.5273 |
| NERC Region | SERC |
| Balancing Authority Code | MISO |
| Balancing Authority Name | Midcontinent Independent Transmission System Operator, Inc.. |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | Y |
| FERC Small Power Producer Docket Number | pending |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Ameren Illinois Company |
| Transmission or Distribution System Owner ID | 56697 |
| Transmission or Distribution System Owner State | IL |
| Grid Voltage (kV) | 12.47 |
| Energy Storage | N |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:17079 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 1条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 2___Plant_Y2025.xlsx#Plant:17079
依据 EV-417dd9bc26af033bdfe9c0a8资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8c4fca37f440af4417a3fe7e5b963db8e9dd6481f17118aa41b896cde32d3da1
