Pine River Solar Park
发电设施 · 未确认
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Grid Voltage (kV) | 138 kV | 原始来源列定义 · 发电厂 · 未确认 基准日期 2025 依据 EV-ef1a7f380368172a55a19926 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Utility ID | 5109 |
| Utility Name | DTE Electric Company |
| Plant Code | 67941 |
| Plant Name | Pine River Solar Park |
| Street Address | 9410 N Luce Rd |
| City | Alma |
| State | MI |
| Zip | 48801 |
| County | Gratiot |
| Latitude | 43.431156 |
| Longitude | -84.683562 |
| NERC Region | RFC |
| Balancing Authority Code | MISO |
| Balancing Authority Name | Midcontinent Independent Transmission System Operator, Inc.. |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | RE |
| Sector | 1 |
| Sector Name | Electric Utility |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Michigan Electric Transmission Company, |
| Transmission or Distribution System Owner ID | 56163 |
| Grid Voltage (kV) | 138 |
| Energy Storage | N |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:14896 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 1条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 2___Plant_Y2025.xlsx#Plant:14896
依据 EV-ef1a7f380368172a55a19926资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cee079860eb4918f1e5c903277e27a142d2edeeeaabefd87a03c3bf4b6d3af1d