FPL Cavendish Solar Energy Center
发电设施 · 未确认
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Grid Voltage (kV) | 115 kV | 原始来源列定义 · 发电厂 · 未确认 基准日期 2025 依据 EV-06d91277f6435c5d66422075 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Utility ID | 6452 |
| Utility Name | Florida Power & Light Co |
| Plant Code | 65438 |
| Plant Name | FPL Cavendish Solar Energy Center |
| Street Address | 100 FPL Landing |
| City | Okeechobee |
| State | FL |
| Zip | 34972 |
| County | Okeechobee |
| Latitude | 27.627009 |
| Longitude | -80.804159 |
| NERC Region | SERC |
| Balancing Authority Code | FPL |
| Balancing Authority Name | Florida Power & Light Company |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | RE |
| Sector | 1 |
| Sector Name | Electric Utility |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Florida Power & Light Co |
| Transmission or Distribution System Owner ID | 6452 |
| Transmission or Distribution System Owner State | FL |
| Grid Voltage (kV) | 115 |
| Energy Storage | N |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:12576 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 1条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 2___Plant_Y2025.xlsx#Plant:12576