Middle Point Landfill Gas Recovery
发电设施 · 未确认
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Grid Voltage (kV) | 26 kV | 原始来源列定义 · 发电厂 · 未确认 基准日期 2025 依据 EV-a77c7b92d6ec5aa83330ae09 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Utility ID | 55858 |
| Utility Name | Energy Developments, Inc d/b/a EDL |
| Plant Code | 56866 |
| Plant Name | Middle Point Landfill Gas Recovery |
| Street Address | 752 Jefferson Pike |
| City | Murfreesboro |
| State | TN |
| Zip | 37130 |
| County | Rutherford |
| Latitude | 35.9342 |
| Longitude | -86.3756 |
| NERC Region | SERC |
| Balancing Authority Code | TVA |
| Balancing Authority Name | Tennessee Valley Authority |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | Y |
| FERC Exempt Wholesale Generator Docket Number | 03-4-000 |
| Ash Impoundment Lined? | X |
| Transmission or Distribution System Owner | Middle Tennessee E M C |
| Transmission or Distribution System Owner ID | 12470 |
| Transmission or Distribution System Owner State | TN |
| Grid Voltage (kV) | 26 |
| Energy Storage | N |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:5067 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 1条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 2___Plant_Y2025.xlsx#Plant:5067
依据 EV-a77c7b92d6ec5aa83330ae09资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cf18f723cb0787475c53f18bdb470f5cbcb6b9e775274ecec696fb19bf8fdd86
