Emery Station / ST1
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 256 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-7391cf8ce968db6e4cea8129 |
| Net Summer Capacity (MW) | 242.3 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-7391cf8ce968db6e4cea8129 |
| Net Winter Capacity (MW) | 247.8 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-7391cf8ce968db6e4cea8129 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 9417 |
| Entity Name | Interstate Power and Light Co |
| Plant ID | 8031 |
| Plant Name | Emery Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IA |
| County | Cerro Gordo |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | ST1 |
| Unit Code | G821 |
| Nameplate Capacity (MW) | 256 |
| Net Summer Capacity (MW) | 242.3 |
| Net Winter Capacity (MW) | 247.8 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Operating Month | 5 |
| Operating Year | 2004 |
| Status | (OP) Operating |
| Latitude | 43.094 |
| Longitude | -93.29222 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:8079 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:8077
依据 EV-31ce2bc93168ef9564ae7756资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5a8eaa021ed6c31eacb871db4b5015dae126d4b5601bade0ed7c8385d0ce66b1
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:8079
依据 EV-7391cf8ce968db6e4cea8129资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 591ff2c116fa274570ec42254a3cb6cbb986abfe8ed25436ffce36fd4c2f3715
