H L Culbreath Bayside Power Station / 6
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 69.9 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-f91729b3dd7ab3754ed04c65 |
| Net Summer Capacity (MW) | 56 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-f91729b3dd7ab3754ed04c65 |
| Net Winter Capacity (MW) | 61 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-f91729b3dd7ab3754ed04c65 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 18454 |
| Entity Name | Tampa Electric Co |
| Plant ID | 7873 |
| Plant Name | H L Culbreath Bayside Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | FL |
| County | Hillsborough |
| Balancing Authority Code | TEC |
| Sector | Electric Utility |
| Generator ID | 6 |
| Nameplate Capacity (MW) | 69.9 |
| Net Summer Capacity (MW) | 56 |
| Net Winter Capacity (MW) | 61 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 4 |
| Operating Year | 2009 |
| Status | (OP) Operating |
| Latitude | 27.9072 |
| Longitude | -82.4231 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:7757 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:7755
依据 EV-b0052bad026cb09b94738303资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 526f718d3844d94a08abd123955c12f00b59e0732fabffbbcf7e1db58c74d9c7
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:7757
依据 EV-f91729b3dd7ab3754ed04c65资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9b9f6e9717c5d61819abaa12c8b11be8624741f1678bab3413b954e7057f2666
