Sycamore Riverside Energy, LLC / SYRVS
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 964 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-99427a0b887043798bf47ac9 |
| Net Summer Capacity (MW) | 964 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-99427a0b887043798bf47ac9 |
| Net Winter Capacity (MW) | 964 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-99427a0b887043798bf47ac9 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 70359 |
| Plant Name | Sycamore Riverside Energy, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IN |
| County | Sullivan |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | SYRVS |
| Nameplate Capacity (MW) | 964 |
| Net Summer Capacity (MW) | 964 |
| Net Winter Capacity (MW) | 964 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 3 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 39.213906 |
| Longitude | -87.54727 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1873 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:2768
依据 EV-c81144561e8b1a07d33ac49c资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5c6ad59d8f7bb62e0befcf2700edc0bc287c092c772c1807c2d3cb2875b6bc74
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1873
依据 EV-99427a0b887043798bf47ac9资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8a972234d4ed1034c439fb73de0bd8f3c76a2b18a7f5bd4425bf2eb2f13cc27a