Franklin White Church Road Solar LLC / WHTCH
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 3 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-1e0d68236f622e0f49e689d8 |
| Net Summer Capacity (MW) | 3 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-1e0d68236f622e0f49e689d8 |
| Net Winter Capacity (MW) | 3 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-1e0d68236f622e0f49e689d8 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 65677 |
| Entity Name | Dimension Energy LLC |
| Plant ID | 69998 |
| Plant Name | Franklin White Church Road Solar LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | PA |
| County | Snyder |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | WHTCH |
| Nameplate Capacity (MW) | 3 |
| Net Summer Capacity (MW) | 3 |
| Net Winter Capacity (MW) | 3 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 3 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 40.780457 |
| Longitude | -77.08402 |
| 原文状态 | (U) Under construction, less than or equal to 50 percent complete |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:729 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:2521
依据 EV-97d91e98c3d715a2ff66f707资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3f0aa6afc4bb970260df14bb26e78257f4d993cbfe517b35ddfa335bb6dcfaf4
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:729
依据 EV-1e0d68236f622e0f49e689d8资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c