Gateway#1&2 (Newark CA) / Gy1a2
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 1.1 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-8cbe345be6722432e2731c7e |
| Net Summer Capacity (MW) | 1.1 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-8cbe345be6722432e2731c7e |
| Net Winter Capacity (MW) | 1.1 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-8cbe345be6722432e2731c7e |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 67754 |
| Entity Name | Coast Energy Holdings, LLC |
| Plant ID | 69895 |
| Plant Name | Gateway#1&2 (Newark CA) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Alameda |
| Balancing Authority Code | CISO |
| Sector | IPP Non-CHP |
| Generator ID | Gy1a2 |
| Nameplate Capacity (MW) | 1.1 |
| Net Summer Capacity (MW) | 1.1 |
| Net Winter Capacity (MW) | 1.1 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 4 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.540903 |
| Longitude | -122.0617 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:783 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:2449
依据 EV-a6793f6789ff76f9fe4a2f4e资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dcb87c6a94ceda469420b76be685eb24b6c52041b8dc10b73351c5c13fea59c5
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:783
依据 EV-8cbe345be6722432e2731c7e资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 11806cb42a77f463dbf08245ed39739a8fc8d38a9bb8ba06bb776b6f68952118