Liberty Station / L9
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 18.1 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-d35c5d7a88cb4365d4dc53e9 |
| Net Summer Capacity (MW) | 17.8 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-d35c5d7a88cb4365d4dc53e9 |
| Net Winter Capacity (MW) | 17.8 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-d35c5d7a88cb4365d4dc53e9 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 5580 |
| Entity Name | East Kentucky Power Coop, Inc |
| Plant ID | 69726 |
| Plant Name | Liberty Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | KY |
| County | Casey |
| Balancing Authority Code | PJM |
| Sector | Electric Utility |
| Generator ID | L9 |
| Nameplate Capacity (MW) | 18.1 |
| Net Summer Capacity (MW) | 17.8 |
| Net Winter Capacity (MW) | 17.8 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.369331 |
| Longitude | -84.95767 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1826 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:2122
依据 EV-2cfdc41f179a1291188479bd资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6808d63b4114a1c86c9deea83b445c4dab38e73ab26752e79e29b94b525b703a
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1826
依据 EV-d35c5d7a88cb4365d4dc53e9资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c