| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 311 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-7592420ceedabfb8f9ee3eb7 |
| Net Summer Capacity (MW) | 302.8 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-7592420ceedabfb8f9ee3eb7 |
| Net Winter Capacity (MW) | 303 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-7592420ceedabfb8f9ee3eb7 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69449 |
| Plant Name | Richland Parish Power Station 1&2 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Richland |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 1B |
| Unit Code | CC01 |
| Nameplate Capacity (MW) | 311 |
| Net Summer Capacity (MW) | 302.8 |
| Net Winter Capacity (MW) | 303 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Planned Operation Month | 3 |
| Planned Operation Year | 2030 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.468339 |
| Longitude | -91.68038 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2055 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1866
依据 EV-1fd6e8c9ff8eb97a10c6485b资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 10d8869f50b4b48861d5269423839c07724eb08ada439178ddc2be38ad350f84
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.