Smarr Combined Cycle Energy Facility / 1
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 459 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-fc166606be9074977af1d9ba |
| Net Summer Capacity (MW) | 407 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-fc166606be9074977af1d9ba |
| Net Winter Capacity (MW) | 432 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-fc166606be9074977af1d9ba |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 13994 |
| Entity Name | Oglethorpe Power Corporation |
| Plant ID | 68546 |
| Plant Name | Smarr Combined Cycle Energy Facility |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Monroe |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | 1 |
| Unit Code | 1 |
| Nameplate Capacity (MW) | 459 |
| Net Summer Capacity (MW) | 407 |
| Net Winter Capacity (MW) | 432 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CC |
| Planned Operation Month | 6 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.975936 |
| Longitude | -83.84369 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1916 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1391
依据 EV-6fe82e5458c55acd70b66b07资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 caac5a5dcd4f979e887187d184c756f73edac210e2fae77e5926d8f13f643a43
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1916
依据 EV-fc166606be9074977af1d9ba资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cad499287d6effd5a5ac3e2b99337605b4ed3a5804243a6d93dfc6a196ba81ab
