Lupinus Solar 1, LLC / LP1PV
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 165 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-b96a5fc98f249a1be4a206c2 |
| Net Summer Capacity (MW) | 165 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-b96a5fc98f249a1be4a206c2 |
| Net Winter Capacity (MW) | 165 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-b96a5fc98f249a1be4a206c2 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 65815 |
| Entity Name | Sunraycer Assets I LLC |
| Plant ID | 66895 |
| Plant Name | Lupinus Solar 1, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Franklin |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | LP1PV |
| Nameplate Capacity (MW) | 165 |
| Net Summer Capacity (MW) | 165 |
| Net Winter Capacity (MW) | 165 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 9 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 30.303385 |
| Longitude | -95.25692 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1010 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:757
依据 EV-f6a365ba731cb87beb115030资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 db0033e8c1217dac36d465aa113ade546b5890566d9f3c3bac7d5152d5a81953
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1010
依据 EV-b96a5fc98f249a1be4a206c2资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f6dcf698e5f1d7c09ecca8029c7aaac140b05ae2da4185fb25d3da7ab4317573