Accalia Point Solar, LLC / 66666
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 190.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-3cf601085abb51177a64fd94 |
| Net Summer Capacity (MW) | 190.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-3cf601085abb51177a64fd94 |
| Net Winter Capacity (MW) | 190.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-3cf601085abb51177a64fd94 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 65687 |
| Entity Name | Accalia Point Solar, LLC |
| Plant ID | 66673 |
| Plant Name | Accalia Point Solar, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Cameron |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | 66666 |
| Nameplate Capacity (MW) | 190.5 |
| Net Summer Capacity (MW) | 190.5 |
| Net Winter Capacity (MW) | 190.5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 5 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 26.098075 |
| Longitude | -97.83752 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1517 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:698
依据 EV-2611f66c23e6d52e12c3ac6d资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ea8e4949587745306ae92b046b3e08374aa8c6a9eb8b4e86d030f90b7e4df232
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1517
依据 EV-3cf601085abb51177a64fd94资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b717525fefc7e4c5bf5274105faebedb85abd5f89d747f7c1aaa5c7dd2d80006