Powells Creek Solar - Hybrid / BESS
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 17.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-edb707ac38caf7e3353e2aee |
| Net Summer Capacity (MW) | 17.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-edb707ac38caf7e3353e2aee |
| Net Winter Capacity (MW) | 17.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-edb707ac38caf7e3353e2aee |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 64610 |
| Entity Name | Powells Creek Farm Solar, LLC |
| Plant ID | 65305 |
| Plant Name | Powells Creek Solar - Hybrid |
| Google Map | Map |
| Bing Map | Map |
| Plant State | VA |
| County | Halifax |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | BESS |
| Nameplate Capacity (MW) | 17.5 |
| Net Summer Capacity (MW) | 17.5 |
| Net Winter Capacity (MW) | 17.5 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 6 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 36.55467 |
| Longitude | -79.0286 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:853 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Retired and Canceled:5619
依据 EV-32a0d6eeac4cc0a809d52f2c资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5799d836f327e42a08289cc342143267f736142e4f0aa89817e33c3cffa63435
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:853