Overton Hydroelectric Project / NA3
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 8.1 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-3b9031d3821768fe30637ade |
| Net Summer Capacity (MW) | 5.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-3b9031d3821768fe30637ade |
| Net Winter Capacity (MW) | 7.5 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-3b9031d3821768fe30637ade |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 61906 |
| Entity Name | Rye Development |
| Plant ID | 62391 |
| Plant Name | Overton Hydroelectric Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Rapides |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | NA3 |
| Nameplate Capacity (MW) | 8.1 |
| Net Summer Capacity (MW) | 5.5 |
| Net Winter Capacity (MW) | 7.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 7 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 31.185978 |
| Longitude | -92.29309 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1584 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:310
依据 EV-2ab9f68832baf14a05cc778e资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7bb6bc1ed88955b5265d0cc29bdf0870b5c41303a630c02024fc0b6ea8d9f8ca
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:1584
依据 EV-3b9031d3821768fe30637ade资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e74db275550df678777378255e06c7b3b876114ebbfbf4ca4b35d15c26e0e9f3
