Dearborn Energy Center / GTG-1
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 15 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-755d217fdfdca2e90240ee1c |
| Net Summer Capacity (MW) | 11.2 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-755d217fdfdca2e90240ee1c |
| Net Winter Capacity (MW) | 14.6 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-755d217fdfdca2e90240ee1c |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 5109 |
| Entity Name | DTE Electric Company |
| Plant ID | 62289 |
| Plant Name | Dearborn Energy Center |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Wayne |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | GTG-1 |
| Unit Code | CTCA |
| Nameplate Capacity (MW) | 15 |
| Net Summer Capacity (MW) | 11.2 |
| Net Winter Capacity (MW) | 14.6 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 12 |
| Operating Year | 2019 |
| Status | (OP) Operating |
| Latitude | 42.2969 |
| Longitude | -83.23125 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:20568 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:20564
依据 EV-f486a73acbb3eb86795b7105资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fc5394a0178bf8bef79ce753a73036b78ca39d797a1ed4519b959f48112ccb21
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:20568
依据 EV-755d217fdfdca2e90240ee1c资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c