A.J. Mihm Generating Station / M1
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 18.8 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-bb92cbc4e87e85151fa5f30e |
| Net Summer Capacity (MW) | 18.9 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-bb92cbc4e87e85151fa5f30e |
| Net Winter Capacity (MW) | 18.9 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-bb92cbc4e87e85151fa5f30e |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 61029 |
| Entity Name | Upper Michigan Energy Resources Company |
| Plant ID | 61391 |
| Plant Name | A.J. Mihm Generating Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Baraga |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | M1 |
| Nameplate Capacity (MW) | 18.8 |
| Net Summer Capacity (MW) | 18.9 |
| Net Winter Capacity (MW) | 18.9 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Operating Month | 3 |
| Operating Year | 2019 |
| Status | (OP) Operating |
| Latitude | 46.792669 |
| Longitude | -88.61401 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:19480 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:19477
依据 EV-9addfcc9b2f3604e1f7c481d资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1421f33ce5a1155ff4c56def515ab5b7ba94a82f6b4cc368464a2cb525dd326f
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:19480
依据 EV-bb92cbc4e87e85151fa5f30e资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a9b40b073c5080a65777d98606e3c6e58da3cf70bb6f87de60fd917287afffb1
