Hyperion Treatment Plant CHP Plant / STG1
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 11 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-5fb3ba61338d9fdba206519a |
| Net Summer Capacity (MW) | 2 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-5fb3ba61338d9fdba206519a |
| Net Winter Capacity (MW) | 2 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-5fb3ba61338d9fdba206519a |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 60396 |
| Entity Name | Constellation New Energy Inc. |
| Plant ID | 60960 |
| Plant Name | Hyperion Treatment Plant CHP Plant |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Los Angeles |
| Balancing Authority Code | LDWP |
| Sector | IPP Non-CHP |
| Generator ID | STG1 |
| Nameplate Capacity (MW) | 11 |
| Net Summer Capacity (MW) | 2 |
| Net Winter Capacity (MW) | 2 |
| Technology | Other Waste Biomass |
| Energy Source Code | OBG |
| Prime Mover Code | GT |
| Operating Month | 4 |
| Operating Year | 2017 |
| Status | (OP) Operating |
| Latitude | 33.9254 |
| Longitude | -118.4298 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:19010 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:19009
依据 EV-da18161653596de7081032a2资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 15b06bbfcc02cb86f9cc98d2f8e6c28e999a0b122d7ebcfe06d22de04f5758f7
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:19010
依据 EV-5fb3ba61338d9fdba206519a资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0f70f7af27b35c1c175df9e6843c8d614aa14a7abde30bf14250016ea6d3288f