Berkeley County Landfill / B2
发电机 · 停运
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 1.6 MW | 原始来源列定义 · 发电机 · (OA) Out of service but expected to return to service in next calendar year 基准日期 2026-08 依据 EV-497a77b5acd6da0d3883db89 |
| Net Summer Capacity (MW) | 1.5 MW | 原始来源列定义 · 发电机 · (OA) Out of service but expected to return to service in next calendar year 基准日期 2026-08 依据 EV-497a77b5acd6da0d3883db89 |
| Net Winter Capacity (MW) | 1.5 MW | 原始来源列定义 · 发电机 · (OA) Out of service but expected to return to service in next calendar year 基准日期 2026-08 依据 EV-497a77b5acd6da0d3883db89 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 17543 |
| Entity Name | South Carolina Public Service Authority |
| Plant ID | 57945 |
| Plant Name | Berkeley County Landfill |
| Google Map | Map |
| Bing Map | Map |
| Plant State | SC |
| County | Berkeley |
| Balancing Authority Code | SC |
| Sector | Electric Utility |
| Generator ID | B2 |
| Nameplate Capacity (MW) | 1.6 |
| Net Summer Capacity (MW) | 1.5 |
| Net Winter Capacity (MW) | 1.5 |
| Technology | Landfill Gas |
| Energy Source Code | LFG |
| Prime Mover Code | IC |
| Operating Month | 2 |
| Operating Year | 2011 |
| Status | (OA) Out of service but expected to return to service in next calendar year |
| Latitude | 33.121111 |
| Longitude | -80.02944 |
| 原文状态 | (OA) Out of service but expected to return to service in next calendar year |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:15477 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:15476
依据 EV-f81a4f1856e75135c39da39c资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 da1a20355bc251db8ba5e2c65faf8efa99f5c53751c5f3463e5fddfe3696d755
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:15477
依据 EV-497a77b5acd6da0d3883db89资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8b3fc81ac1f8d64af823c4530263b88e1615b53dea849aa26a31d8f6a405cacd
