Coolidge Generation Station / COE19
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 49.5 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-56954a3e2bfd54e6446b03e9 |
| Net Summer Capacity (MW) | 42 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-56954a3e2bfd54e6446b03e9 |
| Net Winter Capacity (MW) | 48 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-56954a3e2bfd54e6446b03e9 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 16572 |
| Entity Name | Salt River Project |
| Plant ID | 56948 |
| Plant Name | Coolidge Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Pinal |
| Balancing Authority Code | SRP |
| Sector | Electric Utility |
| Generator ID | COE19 |
| Nameplate Capacity (MW) | 49.5 |
| Net Summer Capacity (MW) | 42 |
| Net Winter Capacity (MW) | 48 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 7 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 32.917399 |
| Longitude | -111.5033 |
| 原文状态 | (U) Under construction, less than or equal to 50 percent complete |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:908 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:193
依据 EV-3001f1804ecb9ff538184a0e资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 39fe60c98c3590b75b0d1fc659db012fd386e2ed73e56336370fa06374c6f82a
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.