Union Power Station / CTG4
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 176 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-560b1b0a1f0f53f22bd1dc35 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 814 |
| Entity Name | Entergy Arkansas LLC |
| Plant ID | 55380 |
| Plant Name | Union Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AR |
| County | Union |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | CTG4 |
| Unit Code | BL02 |
| Nameplate Capacity (MW) | 176 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 4 |
| Operating Year | 2003 |
| Status | (OP) Operating |
| Latitude | 33.296146 |
| Longitude | -92.58936 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:11984 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:11985
依据 EV-e78deb3e4960d17c41709405资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e1c0f0249c3ecdf4ed484e72ee0e0348679d27e88b827023e8d02485b439aa2b
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:11984
依据 EV-560b1b0a1f0f53f22bd1dc35资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 49a8efa2595bb51a1d543bf96d9370b34b2e4bf1b4801d02f4e9642e01377524
