Alliant Energy Neenah / CT02
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 185.5 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-7a12c007322fd82765fd3afa |
| Net Summer Capacity (MW) | 200.1 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-7a12c007322fd82765fd3afa |
| Net Winter Capacity (MW) | 218.4 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-7a12c007322fd82765fd3afa |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 20856 |
| Entity Name | Wisconsin Power & Light Co |
| Plant ID | 55135 |
| Plant Name | Alliant Energy Neenah |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Winnebago |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | CT02 |
| Nameplate Capacity (MW) | 185.5 |
| Net Summer Capacity (MW) | 200.1 |
| Net Winter Capacity (MW) | 218.4 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 5 |
| Operating Year | 2000 |
| Status | (OP) Operating |
| Latitude | 44.1936 |
| Longitude | -88.5064 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:11447 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:11447
依据 EV-e19397771238f7cca1410923资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dbbf6a3e939524fb5386a7bf4bec064d33ec1e6af317051247f628c27dfb9316
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:11447
依据 EV-7a12c007322fd82765fd3afa资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b048db9a24abbd172ad6833a88bb7c841246cedfb07d7964c23438956d5225e3
