Bridgeport Gas Processing Plant / 14
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 0.8 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-f7deb057a876ad58a9b94467 |
| Net Summer Capacity (MW) | 0.8 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-f7deb057a876ad58a9b94467 |
| Net Winter Capacity (MW) | 0.8 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-f7deb057a876ad58a9b94467 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 59366 |
| Entity Name | EnLink Midstream Services, LLC |
| Plant ID | 55053 |
| Plant Name | Bridgeport Gas Processing Plant |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Wise |
| Balancing Authority Code | ERCO |
| Sector | Industrial Non-CHP |
| Generator ID | 14 |
| Nameplate Capacity (MW) | 0.8 |
| Net Summer Capacity (MW) | 0.8 |
| Net Winter Capacity (MW) | 0.8 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Operating Month | 4 |
| Operating Year | 2013 |
| Status | (OP) Operating |
| Latitude | 33.195763 |
| Longitude | -97.80255 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:11265 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:11265
依据 EV-810326c97da42f24a6bc3f23资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 38889d16b9ae2d8349b1d2f0c6a43836db4ec45c48b24a7bdaa4e572e4b09531
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:11265
依据 EV-f7deb057a876ad58a9b94467资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4ae71da725234a17072308016c0982cbab1ddf0c0623955ee17c12f528dc00e0
