Holcombe / 3
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 11.3 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-ddf0abf0ca89afeac302233b |
| Net Summer Capacity (MW) | 7.3 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-ddf0abf0ca89afeac302233b |
| Net Winter Capacity (MW) | 7.3 MW | 原始来源列定义 · 发电机 · (OP) Operating 基准日期 2026-08 依据 EV-ddf0abf0ca89afeac302233b |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 13781 |
| Entity Name | Northern States Power Co - Minnesota |
| Plant ID | 4007 |
| Plant Name | Holcombe |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Chippewa |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 11.3 |
| Net Summer Capacity (MW) | 7.3 |
| Net Winter Capacity (MW) | 7.3 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 1 |
| Operating Year | 1950 |
| Planned Retirement Month | 12 |
| Planned Retirement Year | 2033 |
| Status | (OP) Operating |
| Latitude | 45.223611 |
| Longitude | -91.12722 |
| 原文状态 | (OP) Operating |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:5592 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:5587
依据 EV-2068571e3587a7b9c4e8983d资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ba2698876fac2c991324570f93f132333f208031e479f84eb71a1a73554d1477
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:5592
依据 EV-ddf0abf0ca89afeac302233b资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 bcb3a16767ab4a21db7f0c03936edd2fc50cdfe0ce3321554d2f0bd34e89d4ce
