Cumberland (TN) / STG1
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 323 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-967f9da753ceb44c7d97de10 |
| Net Summer Capacity (MW) | 296.6 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-967f9da753ceb44c7d97de10 |
| Net Winter Capacity (MW) | 305.2 MW | 原始来源列定义 · 发电机 · (U) Under construction, less than or equal to 50 percent complete 基准日期 2026-08 依据 EV-967f9da753ceb44c7d97de10 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 18642 |
| Entity Name | Tennessee Valley Authority |
| Plant ID | 3399 |
| Plant Name | Cumberland (TN) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TN |
| County | Stewart |
| Balancing Authority Code | TVA |
| Sector | Electric Utility |
| Generator ID | STG1 |
| Unit Code | 1 |
| Nameplate Capacity (MW) | 323 |
| Net Summer Capacity (MW) | 296.6 |
| Net Winter Capacity (MW) | 305.2 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2034 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 36.3903 |
| Longitude | -87.6539 |
| 原文状态 | (U) Under construction, less than or equal to 50 percent complete |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2312 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:73
依据 EV-42b6f9ceb01ec53b18895c69资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4864520c46de42fe918204986ec017711d261d5d1c0e2811ed87057f5d58c740
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Planned:2312
依据 EV-967f9da753ceb44c7d97de10资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 24bd3bca485746b962e6c138ce834ba7630fb5fa4c179b2261cc7e9485547b9b