Grand Rapids / 3
发电机 · 停运
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 1.5 MW | 原始来源列定义 · 发电机 · (OS) Out of service and NOT expected to return to service in next calendar year 基准日期 2026-08 依据 EV-01360ce866e0e4f2b2ba31c3 |
| Net Summer Capacity (MW) | 1.5 MW | 原始来源列定义 · 发电机 · (OS) Out of service and NOT expected to return to service in next calendar year 基准日期 2026-08 依据 EV-01360ce866e0e4f2b2ba31c3 |
| Net Winter Capacity (MW) | 1.5 MW | 原始来源列定义 · 发电机 · (OS) Out of service and NOT expected to return to service in next calendar year 基准日期 2026-08 依据 EV-01360ce866e0e4f2b2ba31c3 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 20860 |
| Entity Name | Wisconsin Public Service Corp |
| Plant ID | 1787 |
| Plant Name | Grand Rapids |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Menominee |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 1.5 |
| Net Summer Capacity (MW) | 1.5 |
| Net Winter Capacity (MW) | 1.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 6 |
| Operating Year | 1945 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 45.3547 |
| Longitude | -87.6494 |
| 原文状态 | (OS) Out of service and NOT expected to return to service in next calendar year |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Operating:2779 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Operable:2770
依据 EV-de3059d850d54a58803fdbcc资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8077f4a0f9b00088302bb126c1e8bd40ebee4104d36dba39001997760872b6aa
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 Operating:2779
依据 EV-01360ce866e0e4f2b2ba31c3资料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e904c0809f78c7331adb584c2d04d28ba595f30ab3366f60b9070be1c3926bd2
