Bell Bay Three
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 40 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-7beade66b9a231c9a41b90cd |
| Aggregated Nameplate Capacity (MW AC) | 40 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-7beade66b9a231c9a41b90cd |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 1015 |
| Site Name | Bell Bay Three |
| Site Owner | AETV Pty Ltd |
| Region | TAS1 |
| Max Site Capacity (AC) | 147 |
| Gen Info Unit ID | 101502 |
| Unit Name | Bell Bay Three:2 |
| Technology Type | Gas Turbine |
| Technology Detail | OCGT |
| Gas Turbine Fuel Type | Natural Gas |
| DUID | BBTHREE2 |
| Dispatch Type | Scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 40 |
| Aggregated Nameplate Capacity (MW AC) | 40 |
| Commitment Status | In Service |
| Expected Closure Year | 2040 |
| Survey Last Requested Date | 2026-12-05T00:00:00 |
| Survey Latest Update Date | 2026-03-24T17:55:27 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | In Service |
| source_record_id | Generator Information:89 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 2条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:89
依据 EV-7beade66b9a231c9a41b90cd资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b193c203167de1cb39a078f642c596f4515d27b81d0c9b9d1bc8d081401db3f6
使用条件 AEMO general copyright permission subject to exceptions
数据来源 2026-07-24 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Expected Closure Year:41
依据 EV-7c381a95d733691a05d12f03资料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 0f4047b7f18392457b9094bd412a6c1609e06f0c1e77b03a4e635f4fe9e80c54
使用条件 AEMO general copyright permission subject to exceptions
