Indonesia NeutraDC Nxera Batam hyperscale campus NeutraDC Nxera Batam (Telkom / Singtel / Medco Power JV) | 90 MVA contracted grid apparent power capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónelectrical support secured by contract with PLN Batam Real electricity supply contract, but unit is apparent power MVA. Do not convert to MW without a documented power factor. The source names BTM-1 as first building; contract is campus-level. | 2026-05-15 PT Telekomunikasi Indonesia 2025 Form 20-F, page 79 (PDF page 82) |
Malaysia TM Nxera Iskandar Puteri campus TM Nxera (Telekom Malaysia / Singtel Nxera JV) | 280 MW contracted electricity supply capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónsecured under a multi-year electricity supply agreement Operator explicitly identifies TNB electricity-supply agreement and campus. Press release dateline is 2026-01-12; displayed publication date is 2026-01-22. Campus scalable capacity is separately described as more than 200MW. Do not confuse the two. | 2026-01-22 TM Nxera secures 280MW to power AI-ready, green data centre campus in Johor |
Malaysia Emplazamiento no especificado Bridge Data Centres | 400 MW contracted electricity supply capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónESA signed in December 2024; individual campus not named on cited slide Utility confirms 400MW ESA separately from 100MW renewable BESC. This primary slide does not name MY07, so facility and code remain null rather than importing a press/database mapping. | 2025-03-03 TNB Analyst Briefing 4QFY2024, slide 17 (PDF page 21) |
Malaysia GDS Nusajaya Tech Park campus GDS IDC Services (Malaysia) | 85.5 MW utility supply maximum demand Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónmaximum demand planned for delivery in 2023 under ESA collaboration Primary utility announcement explicitly ties supply to October 2022 ESA, with 16MW interim supply. 85.5MW is described as maximum demand, not quoted as a contract ceiling. Preserve this distinction and historic as-of date. | 2023-03-26 TNB-GDS Collaboration Signals Positive Growth in Foreign Investment for Malaysia Data Centre Market |
Malaysia Johor Sedenak Tech Park campus Yondr | 300 MW critical it design capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretación300MW+ IT load enabled by ESA; planned fully built campus Announcement expressly describes IT load, despite being in an ESA paragraph. Contract gross/grid MW is not disclosed. Displayed date March 12; release dateline March 13, 2024. | 2024-03-12 Yondr Group powers up its first data center campus in Malaysia within two years of market entry |
Malaysia First Johor data center on Sedenak campus Yondr | 98 MW critical it design capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónfull facility IT capacity; first 25MW handed over Facility-level IT capacity within the separate 300MW IT campus. At announcement only first 25MW IT had been handed to client; do not present 98MW as fully live or as electricity contract. | 2025-06-05 Yondr Group achieves first completion milestone six months ahead of schedule at 98MW Johor data center |
Malaysia AirTrunk JHB1, Johor Bahru AirTrunk | 30 MW generation virtual ppa capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónrenewable virtual power purchase agreement with ib vogt Generation procurement/virtual PPA under Corporate Green Power Programme. Not grid connection capacity. Announcement separately calls JHB1 a 150MW facility and initial phases over 50MW. Page also displays later update date December 19, 2024. | 2024-07-30 AirTrunk opens AI-ready data centre in Malaysia, accelerating innovation and the energy transition |
Malaysia Johor AI data center campus, first phase Racks Central | 100 MW facility capacity unspecified Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónfirst phase supported by signed ESA; power basis unspecified ESA existence is confirmed, but 100MW modifies phase capacity rather than an explicit electricity-supply amount; IT versus gross basis is unspecified. Conservatively exclude from exact contract MW. | 2026-04-22 TNB and Racks Central Sign Electricity Supply Agreement for Johor AI Data Center Campus |
Malaysia Emplazamiento no especificado Bridge Data Centres | 100 MW renewable bilateral supply capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónBESC renewable supply under CRESS; campus scope not stated Separate green supply contract from 400MW grid ESA in same slide. These figures are not additive site capacity. Individual campus not named in primary slide. | 2025-03-03 TNB Analyst Briefing 4QFY2024, slide 17 (PDF page 21) |
Sweden Falun data center EcoDataCenter | 10 MW generation ppa physical supply capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónfive-year local hydropower supply capacity, January 2026 through December 2030 Explicit physical generation-linked supply contract from nearby Dalälven plants; Fortum also assumes physical-supply and balance responsibility. 10MW covers a share of energy needs, not campus grid connection capacity or total IT load. | 2026-06-22 Fortum provides local hydropower to EcoDataCenter in Falun, Sweden |
United States Jamestown blockchain facility (Fried Township, Stutsman County, North Dakota) APLD Hosting LLC / Applied Digital | 100 MW contracted electricity supply capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónelectric service capacity; interruptible, with 5MW firm demand level Historic filed contract; supplier name redacted. Agreement clauses explicitly cover 100MW capacity, interruptible service, conditions precedent, five-year initial term and annual continuation. This is not 100MW firm supply and does not establish 2026 contract status. Source date is S-1 filing date. Signature block gives effective date August 4, 2021. | 2021-08-13 Applied Blockchain S-1 Exhibit 10.6: Electric Service Agreement |
United States Panther Creek HPC data center campus, Pennsylvania Bitfarms Ltd. (operator as named in filing) | 350 MW contracted electricity supply capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretacióncontracted grid growth capacity under executed PPL ESA The filing distinguishes contracted growth from additional potential capacity. Do not add historic on-site generation/import capacity to this figure without checking overlap. Contract entered October 2025 per Q3 2025 MDA; 50MW expected end-2026 and 300MW end-2027. | 2026-03-31 Bitfarms Ltd. Form 10-K for year ended December 31, 2025 |
United States Childress campus, Texas IREN | 750 MW contracted grid connection capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónsite grid capacity with executed grid connection agreement Filing states all three Texas sites have executed grid connection agreements. 750MW is grid/site capacity; the same source reports only 650MW operating data-center capacity at June 30, 2025. Do not equate with IT load. | 2025-08-28 IREN Limited Form 10-K for year ended June 30, 2025 |
United States Sweetwater 1 campus, Texas IREN | 1400 MW contracted grid connection capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónsite grid capacity under executed connection agreement; full buildout conditional 2025 filing documents executed grid connection agreements and connection deposits. A 2026-09-08 operator update says Sweetwater substation is energized, 300MW gross construction targets Q4 2027, and ERCOT Batch Zero classifications remain conditional. This is not 1,400MW operational IT load. | 2025-08-28 IREN Limited Form 10-K for year ended June 30, 2025 |
United States Sweetwater 2 campus, Texas IREN | 600 MW contracted grid connection capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónbinding grid connection agreement; originally targeted late-2027 energization Signed connection capacity is explicit. A 2026-09-08 operator update says the two Sweetwater campuses are conditionally included in ERCOT Batch Zero as Base Load, with ongoing approvals. Contract existence does not prove current unrestricted delivery. | 2025-03-17 IREN Secures 2.75GW for Data Centers in West Texas with New 600MW Grid Connection Agreement |
United States AWS Susquehanna-adjacent campus and other Pennsylvania sites Amazon Web Services | 1920 MW generation ppa capacity Alcance: cartera regional que abarca varios emplazamientosCondiciones / límites de interpretaciónfull PPA quantity; ramp by no later than 2032; contract through 2042 Regional nuclear-generation procurement, with ability to deliver beyond Susquehanna-adjacent campus. Do not assign 1,920MW as a single facility grid limit, IT load, or immediate operating draw. | 2025-06-11 Talen Energy Expands Nuclear Energy Relationship with Amazon (8-K Exhibit 99.1) |
United States Denton data center, Texas Core Scientific | 260 MW leased customer it capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretaciónapproximately; customer-leased power under CoreWeave contracts Deck defines customer power as non-redundant IT load and leased power as executed customer commitments regardless of service commencement. This is a colocation customer contract, not a utility power-supply contract. Five-site total ~590MW is separate from ~800MW gross. | 2026-03-02 Core Scientific Q4 FY2025 earnings presentation, slides 5, 12 and 16 |
United States River Bend AI data center campus, Louisiana Hut 8 | 245 MW leased customer it capacity Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretación15-year IT lease Explicitly IT lease capacity, not utility supply contracted MW. Source identifies Google financial backstop; tenant relationship does not make Google facility operator. | 2025-12-17 Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion |
United States River Bend AI data center campus, Louisiana Hut 8 | 330 MW utility capacity disclosed Alcance: consultar las condiciones de la fuente originalCondiciones / límites de interpretacióndisclosed utility capacity supporting 245MW commercialized IT Undated operator project page, retrieved October 5, 2026. Page also lists up to 1,000MW potential expansion; potential expansion is not contracted or operational capacity. No executed power-contract amount established by this page. | River Bend data center campus |