ME - EDFR - Phase I - Bristol
발전시설 · 미확인
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Grid Voltage (kV) | 12.47 kV | 원출처 열 정의 · 발전소 · 미확인 기준일 2025 근거 EV-dec427d15dc27bbc2a3ad4da |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Utility ID | 66074 |
| Utility Name | Overlook Solar Partners, LLC |
| Plant Code | 67194 |
| Plant Name | ME - EDFR - Phase I - Bristol |
| Street Address | 46 Christian Hill Road |
| City | Bristol |
| State | ME |
| Zip | 4539 |
| County | Lincoln |
| Latitude | 43.965641 |
| Longitude | -69.518107 |
| NERC Region | NPCC |
| Balancing Authority Code | ISNE |
| Balancing Authority Name | ISO New England Inc. |
| Name of Water Source | NA |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | Y |
| FERC Small Power Producer Docket Number | QF23-1266-000 |
| FERC Exempt Wholesale Generator Status | N |
| Ash Impoundment? | N |
| Transmission or Distribution System Owner | Central Maine Power Co |
| Transmission or Distribution System Owner ID | 3266 |
| Transmission or Distribution System Owner State | ME |
| Grid Voltage (kV) | 12.47 |
| Energy Storage | N |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:14175 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 1건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 2___Plant_Y2025.xlsx#Plant:14175
근거 EV-dec427d15dc27bbc2a3ad4da자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fb72fa8a0fae958dde61386bd526a11147a7ca26f0ba0fa902c0ac5d3a490989
