Ada Cogeneration LP
발전시설 · 미확인
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Grid Voltage (kV) | 47.6 kV | 원출처 열 정의 · 발전소 · 미확인 기준일 2025 근거 EV-bd625f13b5e37e058ecb816f |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Utility ID | 64125 |
| Utility Name | Ada Cogeneration LLC |
| Plant Code | 10819 |
| Plant Name | Ada Cogeneration LP |
| Street Address | 7575 Fulton Street East |
| City | Ada |
| State | MI |
| Zip | 49355 |
| County | Kent |
| Latitude | 42.962672 |
| Longitude | -85.494071 |
| NERC Region | RFC |
| Balancing Authority Code | MISO |
| Balancing Authority Name | Midcontinent Independent Transmission System Operator, Inc.. |
| Name of Water Source | Municipality |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 3 |
| Sector Name | IPP CHP |
| FERC Cogeneration Status | Y |
| FERC Cogeneration Docket Number | 87-529-000 |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Ash Impoundment? | N |
| Ash Impoundment Lined? | X |
| Transmission or Distribution System Owner | Consumers Energy Co |
| Transmission or Distribution System Owner ID | 4254 |
| Transmission or Distribution System Owner State | MI |
| Grid Voltage (kV) | 47.6 |
| Energy Storage | N |
| Natural Gas Pipeline Name 1 | DTE GAS COMPANY |
| Natural Gas Storage | N |
| Liquefied Natural Gas Storage | X |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:3077 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 1건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 2___Plant_Y2025.xlsx#Plant:3077
근거 EV-bd625f13b5e37e058ecb816f자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ccf875941e782491cbcb5ad7e829fdcc8c6ec24526b1ce4fb89daff09fd05840
