Foundry Ridge Energy Center LLC / FNDRD
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 108 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-c026adca9d05f6f274cce0ad |
| Net Summer Capacity (MW) | 108 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-c026adca9d05f6f274cce0ad |
| Net Winter Capacity (MW) | 108 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-c026adca9d05f6f274cce0ad |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 70360 |
| Plant Name | Foundry Ridge Energy Center LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Walworth |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | FNDRD |
| Nameplate Capacity (MW) | 108 |
| Net Summer Capacity (MW) | 108 |
| Net Winter Capacity (MW) | 108 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 8 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 42.583072 |
| Longitude | -88.72461 |
| 원문 상태 | (P) Planned for installation, but regulatory approvals not initiated |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1654 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:2769
근거 EV-0c2ec36813c6e4ee8c1cecab자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 21e9e8dda9ac514fa571350697984d2cad1ed9afbd91a4314670db91543e13a4
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.