Silver Creek Solar Park / SVCSP
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-b01d19868408b865db23bb58 |
| Net Summer Capacity (MW) | 200 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-b01d19868408b865db23bb58 |
| Net Winter Capacity (MW) | 200 MW | 원출처 열 정의 · 발전기 · (U) Under construction, less than or equal to 50 percent complete 기준일 2026-08 근거 EV-b01d19868408b865db23bb58 |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 5109 |
| Entity Name | DTE Electric Company |
| Plant ID | 69470 |
| Plant Name | Silver Creek Solar Park |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Huron |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | SVCSP |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 8 |
| Planned Operation Year | 2028 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 43.837206 |
| Longitude | -83.05481 |
| 원문 상태 | (U) Under construction, less than or equal to 50 percent complete |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1644 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:1884
근거 EV-56ae9c58284cbc429ea543e8자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 27f6832a4a11743ae9703a358a0dd8a04694c369c64a4b9ebb087a7f6b750cc5
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:1644
근거 EV-b01d19868408b865db23bb58자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 34d3555ba20b611b48197d0fe1b3af345e348c6a2f73e3ba42cb6649aee95010
