Richland Parish Power Station 1&2 / 2B
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 311 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-a84da12de8e083ff57d4c4aa |
| Net Summer Capacity (MW) | 302.8 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-a84da12de8e083ff57d4c4aa |
| Net Winter Capacity (MW) | 303 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-a84da12de8e083ff57d4c4aa |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69449 |
| Plant Name | Richland Parish Power Station 1&2 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Richland |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 2B |
| Unit Code | CC02 |
| Nameplate Capacity (MW) | 311 |
| Net Summer Capacity (MW) | 302.8 |
| Net Winter Capacity (MW) | 303 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Planned Operation Month | 3 |
| Planned Operation Year | 2030 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.468339 |
| Longitude | -91.68038 |
| 원문 상태 | (P) Planned for installation, but regulatory approvals not initiated |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2057 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:1868
근거 EV-e59300b26e58b8f5cb112596자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2cb8167b07ca3454c5d6b60e9da7bfa059d6cd0f01c85eda8a19ebd6776db242
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:2057
근거 EV-a84da12de8e083ff57d4c4aa자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 71f05b4027020428f41828d8749ebe8a232eac639576428857958910e15039df
