Anode (Springville) BESS / ANOD1
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 112.5 MW | 원출처 열 정의 · 발전기 · (TS) Construction complete, but not yet in commercial operation 기준일 2026-08 근거 EV-a4d70337bf6e0e1b1f2fc2fb |
| Net Summer Capacity (MW) | 112.5 MW | 원출처 열 정의 · 발전기 · (TS) Construction complete, but not yet in commercial operation 기준일 2026-08 근거 EV-a4d70337bf6e0e1b1f2fc2fb |
| Net Winter Capacity (MW) | 112.5 MW | 원출처 열 정의 · 발전기 · (TS) Construction complete, but not yet in commercial operation 기준일 2026-08 근거 EV-a4d70337bf6e0e1b1f2fc2fb |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 17609 |
| Entity Name | Southern California Edison Co |
| Plant ID | 65458 |
| Plant Name | Anode (Springville) BESS |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Tulare |
| Balancing Authority Code | CISO |
| Sector | Electric Utility |
| Generator ID | ANOD1 |
| Nameplate Capacity (MW) | 112.5 |
| Net Summer Capacity (MW) | 112.5 |
| Net Winter Capacity (MW) | 112.5 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 36.107903 |
| Longitude | -118.9409 |
| 원문 상태 | (TS) Construction complete, but not yet in commercial operation |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:461 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:529
근거 EV-12ebddca60af6b6f8177173e자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 121a011b829245f2164b10327dc9f33bd0c79656218a753ce42954ada3b4c607
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:461
근거 EV-a4d70337bf6e0e1b1f2fc2fb자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e1b0755dce9745a20b4c2d6965301cc6c2dde0b69316a23fc0a2a170b37284c8
