Philo L&D Hydroelectric Project / NA2
발전기 · 취소·연기
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 1.5 MW | 원출처 열 정의 · 발전기 · Canceled or Postponed 기준일 2026-08 근거 EV-7643b57064ebde56c7c8620d |
| Net Summer Capacity (MW) | 1.2 MW | 원출처 열 정의 · 발전기 · Canceled or Postponed 기준일 2026-08 근거 EV-7643b57064ebde56c7c8620d |
| Net Winter Capacity (MW) | 1.5 MW | 원출처 열 정의 · 발전기 · Canceled or Postponed 기준일 2026-08 근거 EV-7643b57064ebde56c7c8620d |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 61906 |
| Entity Name | Rye Development |
| Plant ID | 62427 |
| Plant Name | Philo L&D Hydroelectric Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | OH |
| County | Muskingum |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | NA2 |
| Nameplate Capacity (MW) | 1.5 |
| Net Summer Capacity (MW) | 1.2 |
| Net Winter Capacity (MW) | 1.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Latitude | 39.870343 |
| Longitude | -81.90977 |
| 원문 상태 | Canceled or Postponed |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:1315 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Retired and Canceled:5471
근거 EV-cd86d7e6ade43516eb761bf9자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 26c9b06457b3132a31af61b4f8f3c1e186657a5a8278bb38f2de8e6433c8bcbc
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Canceled or Postponed:1315
근거 EV-7643b57064ebde56c7c8620d자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4edf4422dfe6064b7cbf65fce41e4f949846e60713cff0799a06f15bc8cb5284
